- September 3: GM's Special Coverage N192219480 Program Closes Investigation investigations | 16 days ago
- September 2: GM Transmission Class Action Lawsuit Continues After Appeal news | 17 days ago
- September 2: GM Duramax Lawsuit Partially Brought Back on Appeal news | 17 days ago
- September 2: Chevy 'Shift to Park' Class Action Lawsuit: GM Says Toss It Out news | 17 days ago
- August 4: GM Peeling Paint Class Action Lawsuit Says Recall Needed news | 46 days ago
Chevrolet TSB #PIP5345A
2015 Chevrolet Tahoe
TSB Document:
Affected Component: POWER TRAIN
- Summary
- This Preliminary Information communication provides information to the technician about being to achieve pre-load when setting up the pinion bearing pre-loads during reassembly of the 9.5/9.76 inch rear axles. Technician will need to use pinion gear install washer part number 11609638 onto the pinion shaft between the flange and nut. Tighten the pinion nut until you achieve 10 pound inch or 1.0 newton rotating torque. After the torque has been achieved back the nut off and remove the washer. Tighten the nut back down until you achieve 15 pound inch or 1.7 newton meters for used bearings or 20 pound inch 2.25 newton meters for new bearings.
Click a tab for more information.